#MANUAL TASKS RISK ASSESSMENT TOOL MANTRA INSTALL#Engineering controls – use a sheet lifter to install plasterboard sheets.Replace hand tools with power tools to reduce the level of force needed Substitution – substitute heavy items with lighter, easier to handle items.Elimination – Does the task need to be done? Can the materials be lifted by crane instead?. #MANUAL TASKS RISK ASSESSMENT TOOL MANTRA MANUAL#Use the following Hierarchy of Controls to determine what level of control you need to manage the risks associated with manual tasks: You should consult with suppliers, designers and subcontractors before work begins to have the best chance of eliminating the risks. Is there an alternative method or machine that can be used to lift, move or install the material, or perform the work?.How many people will be needed to safety perform the task?.Can heavy materials be delivered in smaller, more manageable sizes?.You should consider the following before commencing work: The key to preventing musculoskeletal disorders and managing the impact of manual tasks is to take action at the planning and design stage of the project. You should try to eliminate or reduce hazardous manual tasks early on at the building design stage. It’s important to identify hazardous tasks and implement suitable control measures to eliminate or reduce the risk of injury.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |